Project contractors

Coordinate the equipment package and assign responsibility for every interface.

Planning scenario — no completed-project result is claimed.

Start with the operating conditions

Identify the vehicles, goods and handling equipment using the bay. Measure the available approach space, dock height, openings and existing equipment. Record which interfaces can change and which are fixed.

Equipment and interfaces to review

Project contractors: indicative scope for discussion
ScopeSelection considerationQuantity
Loading HousesBuilding elevation and available space; Foundation design; Shelter, leveler and door interfacesConfirm per bay and project
Dock LevelersDock and vehicle heights; Pit dimensions and civil works; Forklift operating weight and axle loadsConfirm per bay and project
Dock Doors for Loading BaysDoor opening and guide clearances; Door closing line and leveler position; Control and interlock requirementsConfirm per bay and project

Record to agree

  • Requirements brief
  • Equipment shortlist
  • Drawing confirmation record
  • Inspection requirements
  • Delivery document schedule

Before selecting equipment

Confirm dock and truck heights, load information, door opening, pit geometry, power supply and temperature requirements. Installation and local compliance responsibilities must be assigned for the project.

Plan this loading bay